Line efficiency starts in the CAD, not on the floor.
2026
Client
BrahmWorks Insights

The Challenge
You make the work divisible into stations that finish inside the time the line has, with parts presented already oriented, and with checks that fit in the station. Design for assembly made it possible for someone to put the product together.
The line is a design constraint. A base that sits without being regrasped, fasteners from one direction, and a test no longer than the mechanical work, are product decisions.
Assembly Line Efficiency
What we did
Industry
DFM and manufacturing
Description
This Insights guide explains Assembly Line Efficiency for founders and engineering teams building hardware that must be manufactured, tested, and handed off. The line is a design constraint. A base that sits without being regrasped, fasteners from one direction, and a test no longer than the mechanical work, are product decisions. It also covers takt is a demand, not a wish; presentation, fixtures and regrasps; test has to fit the rhythm.




The Outcome
Takt is computed from real hours and real demand. Every station's content fits under takt, including the check done there. The longest station is known, and it is not 'whoever is good at cables'.
“You make the work divisible into stations that finish inside the time the line has, with parts presented already oriented, and with checks that fit in the station.”
BrahmWorksHardware practice note