BrahmWorks helps hardware teams design for FCC and CE requirements, prepare for pre-compliance and formal testing, and work with accredited laboratories. We are a design and engineering partner, not a test lab, a Telecommunications Certification Body, or a notified body, and we do not issue certificates.
Design for compliance, not a last-minute test
Certification is easier when EMC, safety and radio rules shape the design early: stack-up, grounding, return paths, filtering, cable routing, enclosure shielding, power architecture and the choice of radios and power supplies. Late surprises — a failed emissions scan or a radio module used outside its approved conditions — are usually design problems, not lab problems.
On our electronics design work we already design with CE in view, and boards from that work have been accepted in European markets. Which directives, standards and labs apply is confirmed during scoping. As we note on our prototype-to-production page, a manufacturing run is not a certificate.
Pre-compliance: find issues before the formal test
Pre-compliance is a rehearsal, not a certificate. The aim is to find emissions, immunity or safety problems while the layout and enclosure can still change. Typically this includes:
- A test plan against the standards that will apply, including whether the product is an intentional radiator, an unintentional radiator, or both
- Preparing a stable, representative unit (firmware, cables, modes and worst-case configurations)
- Lab pre-compliance scans for radiated and conducted emissions, and other checks the plan calls for
- Root-cause work and design changes — filters, layout, grounding, shielding, firmware duty cycles — then a re-test
We treat this as part of engineering validation. You leave with a clearer risk picture, not a claim that the product is already certified.
FCC Part 15: unintentional and intentional radiators
Most electronic products sold in the United States have to meet FCC Part 15 rules for radio-frequency emissions.
Unintentional radiators generate radio-frequency energy as a by-product of digital or switched-mode circuitry — a controller board, a power supply, or a product with clocks but no radio of its own. Many follow the Supplier’s Declaration of Conformity (SDoC) path: the responsible party has the product tested to the applicable Part 15 limits (often Class A for industrial use or Class B for residential), keeps the records, and labels the product correctly. A typical SDoC device does not receive an FCC ID.
Intentional radiators deliberately transmit — Wi-Fi, Bluetooth, cellular, LoRa or another radio. Most require FCC Certification through an FCC-recognized Telecommunications Certification Body (TCB). The certified transmitter is listed in the FCC database and carries an FCC ID. A product can be both: a connected device often needs Certification for the radio and still has to meet Part 15 limits for its digital circuitry.
A pre-certified radio module can reduce the radio portion of the work if it is used under its grant conditions, but it does not automatically certify the finished product. Antenna, layout, enclosure, host emissions and labelling still have to be correct.
CE marking: EMC, LVD, RED and RoHS
For the European Union, CE marking is the manufacturer’s declaration that the product meets the applicable directives. The manufacturer (or their authorised representative) signs the EU Declaration of Conformity and keeps a technical file. BrahmWorks can help prepare the design and supporting documentation. We do not sign the declaration in the manufacturer’s place unless that role is formally agreed; typically you, or your EU legal manufacturer, remain the responsible party.
Directives that commonly apply to hardware products:
- EMC Directive — electromagnetic emissions and immunity for equipment that is not radio equipment under RED
- Low Voltage Directive (LVD) — electrical safety for many products in the LVD voltage ranges
- Radio Equipment Directive (RED) — products that intentionally transmit or receive radio waves, bringing together radio, EMC and safety requirements
- RoHS — restriction of specified hazardous substances in electrical and electronic equipment
Other directives can apply depending on the product; we will name those in scoping. Some routes allow the manufacturer to self-declare against harmonised standards; other cases need a notified body.
How we work with accredited test labs
Formal FCC Certification, many CE tests, and often a defensible SDoC or technical file depend on measurements by an appropriately accredited laboratory. We are not that laboratory. Our role is to help you choose the right path and lab; prepare units, fixtures and documentation; join test planning so worst-case configurations are exercised; diagnose failures and change the design; and help assemble technical-file material.
You (or your legal manufacturer) remain responsible for the declaration, labelling and ongoing compliance of production units. This support sits alongside our electronics, firmware and prototype-to-production work, and is often relevant to IoT products and EV electronics.
Frequently asked questions
Does BrahmWorks certify products or issue FCC or CE certificates?
No. We are a hardware design and engineering partner. Accredited labs perform the formal tests. An FCC TCB issues Certification and an FCC ID where that path applies. For CE marking, the manufacturer or authorised representative signs the EU Declaration of Conformity. We do not issue certificates.
Can you help if we already failed an EMC test?
Yes. We start from the test report and the current design, find likely causes in layout, grounding, filtering, cables, enclosure or firmware, change the design, and support a re-test with the lab.
Do we still need testing if we use a pre-certified radio module?
Often yes. A certified module can reduce the radio portion of the work if used within its grant, but the host product still has emissions, and possibly safety and RoHS obligations, and must meet the module’s conditions.
When should certification work start?
Before the design is frozen and before hard tooling, once the architecture, radios and power approach are clear. Pre-compliance is cheapest when a respin is still possible. We also join later when a test has failed or a market entry is blocked.
Do you only support FCC and CE?
FCC (especially Part 15) and CE (EMC, LVD, RED and RoHS) are the paths US and European hardware teams ask us about most. Other marks are product-specific and confirmed during scoping.
Have you designed electronics for European markets before?
Yes. Our electronics design work includes CE-minded design, and boards from that work have been accepted in European markets. Formal approval for a new product still follows that product’s own test path.
Start a certification-minded design review
For FCC or CE certification support, email sanjay@brahm.works, call +91 9902831848, or use the contact page. Bring a brief, a schematic, or a failed test report, and we will tell you what we can take on and what must be done by a lab.